I have rolled over a timetable but need to change the period times and length of the inter-period breaks. Is it possible without having to open a new database and then add in all the resources anew. URGENT please if anyone can assist me with changing the the period times and length of the inter-period breaks in an existing database / timetable year. Thanks |